Solar plant TEC-2

2022

Client: TEC-2.

Design, coordination, solar plant installation, and passive lighting protection. The total power reaches 100 kW.

The TEC-2 is Thermal Electrical station, Riga. SIA Tesla built the solar plant for TEC-2 to cover its self-consumption. Its consumption is vast, and the TEC-2 used its free territory.

Photo SIA Tesla/ TEC-2/ 2022

The Ogre Central Library

Solar panels mounted above the car park on metal structures generate energy for the library’s internal consumption. In turn, intelligently controlled lighting, installed in the building by SIA Tesla, changes the lighting level depending on the influx of natural light.

Lasīt vairāk »

14. jūlijā vebinārs!

Nosūtīsim pieslēgšanās instrukcijas epastā.